Pineview Water Systems Design Criteria and Standards apply to new development, subdivisions, and improvements connecting to the secondary water system. Engineers, developers, and contractors should use this document when designing and building facilities that will connect to or be owned by the district.
Current edition: October 2026
Download the Design Criteria and Standards (PDF, 6 MB)
What’s Included
- Part I: Design Criteria (concrete lined reservoirs, pump stations, water efficiency standards for new developments)
- Part II: Technical Specifications (painting and coating, corrosion control and cathodic protection, HDPE and PVC pipe, pipeline testing, valves and fittings)
- Part III: Standard Drawings (Details 101 through 180, including meter and pit setters, valves, thrust blocks, trench sections, and cathodic protection)
Questions
Daniel Johnson, P.E., Engineering Superintendent
djohnson@pineviewwater.com

Minutes
District Maps
Conservation Tips Slow the Flow!
Construction Projects
Design Standards
Forms: Applications, Petitions, Licenses
Service Connection Information